Transformer factory present situation Report writing


W4U TRANSFORMER LTD.

Transformer factory present situation Report 

Transformer factory present situation Report of W4U Transformer Ltd, Bhaluka, Mymensing, Bangladesh.

Transformer Factory Present Conditions / Situations Report of W4U Transformer Ltd, Bhaluka, Mymensing, Bangladesh.
Date of Reporting : 05/07/2020
Time : 8.00 PM
Reporting By : Engr. M. A. Masud Khan,
Cause of Reporting: Corona Problem
                      Project Manager

                      W4U Transformer Ltd.


For REB single phase transformer and BPDB three phase transformer manufacturing and preparation for tender, here I would like to inform you about the shed, crane, certifications, machines and others conditions/situations.

Report Writing of Industry



Information of Shed:

1.      Main Production, Washing Plant, Painting Plant and Sub-Station shed are completed.

2.      Washing plant and painting door canopy setting - Making complete. (Fitting remain –My transformer team can’t fitting this because height).

3.      Testing room making (steel fabrication work & RCC casting work): - All materials in hand which are received 13 th February 2020, I have contacted with Engr. Ismail vaiya who has been suggested me then I have started my work with Transformer manufacturing team where most of the personnel are unskilled in construction work.

Here we have almost done steel work, we are working for its shattering (from 1st June to 5th June 2020 we could not work because insufficient balance in Pre-paid electric meter), I have already informed all details Engr. Ismail time to time.

4.      Chemical Tank Pipe fitting for water and heater - just small amount of materials not available at site. But this Pipe Fitting work always start just after Chemical tank pasting, here I need inform you that our work done at 29th February 2020.

At February’20 our team (where only two wielders and workshop person others are special machine operators that’s why most of work is slow) work for PI Pipe thread Cutting, Cable Tray making, Table fame making, Chemini, Plunge making and delivery to Bristy Attires Ltd.

And March’20 this team work for BD Box for TCL, BD Box, Table frame, PI Pipe thread Cutting for Bristy Attires Ltd, MS sheeting repair and making for B&T Development Uttata, BSTI Sample Transformer – 2 Pces 250KVA 3- Phase Transformer.

5.      Chemical Tank walking base making (RCC & Steel work), very small amount of materials will require. But this work always start just after Chemical tank pasting, here I need inform you that our work done at 29th February 2020. At these months we are busy with above details work.

6.      Sub-Station is already done gate and 2 sides wall will be after sub-station equipment installation. Shed inside electrical wiring and BD Box setting will be done after making (in house) and cable purchase we can do so, but we have discussed that we do this after confirmation of any transformer tender.

Information of Crane:

1.      Main production: Without main power trolley driving Motor setting, it is done. (We have decided that it will be done after confirm Tender).

2.      Washing Plant Crane: Without main power trolley driving Motor all materials are available here but because of unavailable skilled technicians we could not do.
Information of Certification & Licensing:
SL No
Description
Remarks
1
Renew the Fire License - 2020-21
Need to Renew
2
Renew the Environment Permission  - 2020-21
Need to Renew
3
Renew the Trade License - 2020-21
Need to Renew
4
Renew the Chamber of Commerce Membership - 2020-21
Need to Renew
5
BSTI Transformer Testing - 250 KVA
Sample already submitted in BSTI
6
ELB License Work
After BSTI Certification we can go for next steps
7
ELB Supervisor License
After BSTI Certification we can go for next steps
8
Powroshova Plan Approval
Document Submitted but waiting for Speed money approval
9
Transformer Type Test (5, 10, 15, 25, 37.5, 50, 75 & 100 single Phase Transformer and 200 & 250 KVA Three Phase Transformer) Done

10
ISO Certification
We have submitted all documents and Mr. Monjur monitoring this from HO.

Information of Employees and Salary:








SL No.
Name Of Employee
Designation
Joining Date
Basic Salary
Fooding
Others
Net Salary
1
Md. Shafiqul Islam
Accounts Executive
02.03.2017
11,600.00
1,500.00
                   -   
13,100.00
2
Md. Azadur Rahman
Mechanical workshop Technician
15.09.2018
26,000.00
                -   
                   -   
26,000.00
3
Md. Allauuddin
CCA Technician
01.12.2018
25,000.00
                -   
                   -   
25,000.00
4
Md.Rakibul Islam
LT & HT-Winding Operator
01.12.2018
18,000.00
                -   
                   -   
18,000.00
5
Md. Mosharaf Hosain
Security
21.02.2018
6,000.00
2,000.00
2,000.00
10,000.00
6
Md. Ashraful Islam
Security
08.06.2020
6,000.00
2,000.00
2,000.00
10,000.00
7
Md. Rakibul Islam
Security
20.12.2018
6,000.00
2,000.00
2,000.00
10,000.00
8
M Rashed Khan
Security
20.12.2018
6,000.00
2,000.00
2,000.00
10,000.00
9
Rasida Khatun
Bua
01.03.2017
4,300.00
                -   
                   -   
4,300.00
Total =
1,08,900.00
9,500.00
      8,000.00 
1,26,400.00









NO. OF PERSON
9






AVG. NET SALARY
14,044.44






TOTAL NET SALARY
1,26,400.00









Information of Machines:


This list of machines are for 50 Pces 10 KVA Transformer per 10 working hours

SECTION : WINDING

SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)

1
HT coil winding machine
5
5
One of them need to service

2
LT coil winding machine with Tensioner
5
5
One of them need to service

3
Paper Slitting M/C
1
1


4
Press Board Shearing M/C (Manual), 660mm
1
1


5
Press Board Shearing M/C (Motor Operated)
1
0
After Confirm tender then need to collect

6
Ox-Acetylene Gas Cylinder set with Regulator & Touch
1
1


7
Coil Press Machine
1
0
After Confirm tender then need to collect

8
Wood Saw M/C
1
1














SECTION : COLD ROLLED GRAIN ORIENTED SILICON STEEL (CRGO)








SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Batch Annealing Furnace for Wound Core
1
1


2
Progressive cross cutting machine with de-reeled,
2
1 (Local) 50 pces per day
After Confirm tender then need to collect one more

3
Auto Sewing Core Cutting Machine ( 3 Phase Tx)
1
0
After Confirm three tender then need to collect, others time we can outsourcing the cutting core for three phase transformer.

4
Core Forming Machine
1
1 (Need to change)
After Confirm tender then need to change, this one can be collected locally.

5
Core Coil Winding Table
6
3
After Confirm tender then need to in house build more

6
TIG Welding machine, (200A)
2
1
After Confirm tender then need to collect one more

7
Wretched Machine (Tensioner)
2
1
After Confirm tender then need to collect one more

8
Digital Weighting Table 1000kg & Small 60kg (1+1)
2
1 (1000Kg)
After Confirm tender then need to collect one small scale

9
Lifting magnet ( 300kg & 500KG)
3
2
After Confirm tender then need to collect one more

10
Air Compressor, 5HP
1
1


11
CRGO Slitting Line
1
1


12
DeCoiler-1 for Progressive Shearing Machine
2
1 (Local Made - Low capacity)
After Confirm tender then need to collect one more

13
Manual Shearing Machine (Motorized)
1
0
After Confirm tender then need to collect one

















SECTION : TANK FABRICATION


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
MS Shearing Machine
1
1


2
MS Sheet Rolling Machine
1
1


3
Power Press for Top/Bottom Cover Cutting/Forming (250T)
1
1


4
Power Press for Top/Bottom Cover Cutting/Forming (200T)
1
1


5
Power Press for LT/HT Bushing Hole Making, 150T
1
1


6
Power Press for Top/Bottom Cover Cutting/Forming (100T)
1
1


7
Power Press for Top/Bottom Cover Cutting/Forming (75T)
1
1


8
Bench Drill Machine (big), 1"
1
0
After Confirm tender then need to collect one

9
Bench Drill Machine (small), 3/4"
1
1


10
Heating chamber for Phosphate Tank Drying
1
1


11
Oxygen and LPG Gas Cylinder with regulator and Cylinder
2
1


12
Air Compressor
1
0
After Confirm tender then need to collect one to operate the Powder coating plant

13
MIG Welding Set, (500A) with CO2 Regulator and Cylinder
3
1
After Confirm tender then need to collect two

14
Bench Grinding Machine
1
0
After Confirm tender then need to collect one

15
Hand Grinding Machine
6
4
After Confirm tender then need to collect two

16
Washing Plant with 7 Tank system
1
0
without pipe fitting its done, (5th June 2020, we have no employee). Need to pay the supplier (Color Point Trade)

17
Tank Drying Chamber
1
1


18
Powder Coating Booth with spray gun and panel (double)
1
1
 Need to pay the supplier (SE Engg)

19
Hydraulic Bending Machine
1
1


20
Hydraulic Power Press
1
0
After Confirm tender then need to collect one

21
Welding M/C, electric
6
4
After Confirm tender then need to collect two

22
Circular Cutting Machine
1
0
When more and more production will require

23
Seam Welding Machine
1
0
If we want to produce 3 Phase Transformer then need radiators for tender base production before that we can outsource.

24
Hand Palette, (2Tons)
2
0
After Confirm tender then need to collect two













SECTION : CORE COIL ASSEMBLING (CCA)


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Wretch Machine (Tensioner), ITW Signode
4
0
After Confirm tender then need to collect these

2
Oxygen-Acetylene Gas Cylinder With Regulator & Cutting torch
1
0
After Confirm tender then need to collect one

3
Hydraulic Compressor Tool for LT Lug
1
1


5
Bench Drill Machine
1
0
After Confirm tender then need to collect one

6
Ball Power Press, 30 Tons
1
0
After Confirm tender then need to collect one

7
Vacuum Pump with Tank for Wood Treatment
1
1


8
CCA assembly Table
3
2
After Confirm tender then need to collect one

9
Wood Planner
1
0
After Confirm tender then need to collect one

11
Wooden Drying Chamber
1
1


12
Hand Palette, (2 Tons)
1
0
After Confirm tender then need to collect one













SECTION : ASSEMBLY


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Vacuum Drying Chamber
1
1


2
Oil Centrifugal Machine
1
1


3
Oil Feed Pump
1
0
After Confirm tender then need to collect one

5
Air Compressor
1
0
After Confirm tender then need to collect one

6
Oil Storage Tank (150T)
3
0
After Confirm tender then need to collect because of at that time we need to import the transformer oil

7
Vice Set
3
1
After Confirm tender then need to collect

8
Pneumatic Bolt Tightening Wrench with Air Compressor
2
1
For more and more production then this one will require

10
Hand Palette
1
0
After Confirm tender then need to collect one

11
Vacuum Cleaner
1
0
After Confirm tender then need to collect one

12
Necessary tools for Assembly
1
0
After Confirm tender then need to collect one set











SECTION : ELECTRICAL SUBSTATION


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)

1
Diesel Generator, (500 VA), Stamford
1
1 (375 KVA)


2
Fork Lift, (5 Ton), TCM
1
1


3
Hand Pump
1
1








SECTION : STORE


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Digital Weighing Balance 5 Ton
1
0
After Confirm BPDB tender then need to collect one

2
Materials Storage Rack
7
3
After Confirm tender then need to make in house







SECTION : TESTING SECTION


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Digital Insulation Tester (Megger), 5000 volt
1
1
This one only for Inspection test

2
Digital Insulation Tester (Megger), 1000 volt
1
0
After Confirm tender then need to collect one set because of rough test

3
3P Ratio Meter
1
1


4
Winding resistance Meter, Megger Co.
1
1
This one only for Inspection test

5
Winding resistance Meter, Agronic Co.
1
0
After Confirm tender then need to collect one set because of rough test

6
Transformer Oil Testing Machine (BDV) with Printer (auto)
1
1


7
Power Analyzer (Normal)
1
0
After Confirm tender then need to collect one set because of rough test (Low Price)

8
Power Analyzer (Yokogawa) WT 330
1
1
This one only for Inspection test

9
Power Frequency High Voltage Test Set
1
1
We have purchased but not installed because of corona virus.

10
Induced Over Voltage Test Set, 1000V, 200hz
1
1
We have purchased but not installed because of corona virus.

11
Lifting Impulse Test Set 400KV, 20KJ
1
1
We have purchased but not installed because of corona virus.

12
Transformer oil Tan Delta test Set
1
1
We have purchased but not installed because of corona virus.

13
Clamp on Meter (V/A/F)
2
1
After Confirm tender then need to collect one

14
Variac, 20A, 1P
2
1
After Confirm tender then need to collect one, can be collect from local suppliers.

15
Variac, 100A, 3P
1
1
We have purchased but not installed because of corona virus.










SECTION : COPPER PLANT SECTION


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Vertical Super Enamel Plant (13 SWG to 22 SWG), 8 lines
1
1
These are now in factory but not installed, I have contacted the machine manufacturer and they have some terms and conditions, at that time we take decision we will do this later.

2
Super Enamel Testing Machine :
1
1

3
Flattening Mill for Copper Strip Making
1
1

4
Copper Strip Annealing Pot and Furnace
1
1

5
Horizontal Paper Covering Machine (3 Spools)
1
1

6
Hand Palette, (2 tons)
2
0







SECTION : MAINTENANCE SECTION


SL. NO.
Description of Machines
Quantity
Condition of machines

Need (Units)
Available (Units)


1
Bench Drill Machine
1
1


2
Milling Machine
1
1


3
Welding Machine
1
1


4
Lathe Machine, (8')
1
1


5
Lathe Machine, (6')
1
1


6
Shaper Machine, (24')
1
1


7
Roller Thread Machine
1
0
After Confirm tender then need to collect one

8
Floor mounted Grinding Machine
2
1


9
Surface Grinding
1
0
After Confirm tender then need to collect one

10
Table Vice
2
1
After Confirm tender then need to collect one